• IFAD – Masonry Thru-Wall Flashing & Key Interface Details 1.0 CEU/HSW

    Masonry Thru-Wall Flashing & Key Interface Details Explore the continuity of water and air control layers in relation to masonry thru-wall flashing at critical interface details, including: base-of-wall, window sill, openings heads, shelf angle, veneer material transitions, and top-of-wall. Learning Objectives: Understand masonry thru-wall flashing function and options Realize how masonry thru-wall flashing coordinates with […]

  • IFAD – Failure is Not an Option: Air Barrier Continuity Strategies for Storefront and Curtain Wall Systems 1.5 CEU/HSW

    Failure is Not an Option: Air Barrier Continuity Strategies for Storefront and Curtain Wall Systems Critical details that typically cause building performance-related issues will be focused on one of the largest failures of building enclosures: wall-to-window connections specific to curtain wall systems and storefronts. A step-by-step look at each critical detail regarding the sequence of […]

  • Beyond the Sill Seal: A Modern Approach to Air Barriers for Long-Lasting Building Enclosures 1.0 CEU/HSW

    Beyond the Sill Seal: A Modern Approach to Air Barriers for Long-Lasting Building Enclosures The effectiveness of air barriers in building enclosures is critical for energy efficiency, comfort, and indoor air quality. Traditional gasketing materials, such as sill seals, have long been utilized to manage air infiltration. However, these materials often fall short in meeting […]

  • New Air Barrier Requirements for Re-Roofing 1.0 CEU/HSW

    New Air Barrier Requirements for Re-Roofing As energy codes evolve, so do the requirements for roof system performance — especially during reroofing projects. This course explores the latest updates to building codes and standards that introduce air barrier requirements when replacing existing roofs. Attendees will learn why air control matters, how it interacts with moisture […]

  • Predicting Rooftop Surface Temperature Extremes and Impact on Air Barrier Tie-Ins 1.0 CEU/HSW

    Predicting Rooftop Surface Temperature Extremes and Impact on Air Barrier Tie-Ins Roofing system surfaces can get hot, sometimes extremely hot due to climatic and indoor design conditions, direct and reflected solar radiation exposure, and radiative heat transfer with surrounding objects. Roof surface color, the position and color of adjacent objects, as well as the thermal […]

  • ABAA Contractor Webinar: Building Science Fundamentals

    Buildings are designed to separate indoor and outdoor environments, but differences between them create forces that challenge the building envelope. Key demands include managing liquid water, air, heat, and water vapor flows. While these concepts seem simple, their complexities often lead to confusion, such as distinguishing between air and vapor barriers. This presentation explores how […]

  • Akira Window Connection: Pathways to Thinner Exterior Walls 1.0 CEU/HSW

    Akira Window Connection: Pathways to Thinner Exterior Walls Akira Window Connection – a market ready punched window installation method that nearly eliminates window transition thermal bridging. This innovation helps reduce wall thickness, embodied carbon emissions, construction cost, and meet performance-based energy targets. In partnership with Northern Facades and Cascadia Windows, we will discuss maximum window […]

  • Achieving a High-Performance Air Barrier System 1.0 CEU/HSW

    Achieving a High-Performance Air Barrier System Air Barriers are an extremely important component of a high-performance building enclosure system. For the most part, these systems are non-maintainable components and repairs can typically only be made with the removal of the exterior cladding system. To ensure a performing system, proper design, detailing and ultimately the proper […]

  • Commissioning the Air Barrier 1.0 CEU/HSW

    Commissioning the Air Barrier The IECC 2021 requires air barrier commissioning and/or whole building air tests as part of the code compliancy pathways. The process is an essential step to ensure that the building enclosure assembly performs as intended and complies with the energy code. The presenter will detail the commissioning process as it relates […]

  • Building Envelope Solutions: Building Code Compliance for Fire, Air, Water, and Vapor 1.0 CEU/HSW

    Building Envelope Solutions: Building Code Compliance for Fire, Air, Water, and Vapor This presentation discusses the key Building Code and Industry Standards for meeting fire, air, water, and vapor requirements in Residential and Commercial construction projects. The building envelope is an essential integrated system in new construction. When system components are incorrectly installed or if […]

  • Sink or Swim: Effective Natatorium Envelope Design Thru Case Study 1.0 CEU/HSW

    POSTPONED Sink or Swim: Effective Natatorium Envelope Design Thru Case Study Participants will develop a comprehensive understanding of the potential risks involved in designing roof and wall assemblies over pools and other corrosive environments. The session will cover effective design strategies to mitigate moisture damage by managing air, temperature, and vapor control. Key roof assembly […]

  • ABAA Contractor Webinar: Air Barrier Submittals – Shop Drawings, Design Intent, and the Risk of Detail Clarifications Becoming Changes

    This interactive panel discussion will address shop drawing submittals and their role in construction. The speaker panel will have representative from legal, architectural, installer, and general contractor backgrounds who will discuss responsibilities of each party, and what risks each party may be talking on, knowingly or unknowingly. The panel will also discuss best practices for […]