• Whole Building Air Tightness Tests: Building Preparation and Sampling 1.0 CEU/HSW

    Whole Building Air Tightness Tests: Building Preparation and Sampling All measurement tests inherently have error associated with the testing procedures, and whole building airtightness is no exception. Whole building airtightness testing is typically performed on construction sites, for buildings of various size and shape, sometimes still in various stages of construction. Different techniques are often […]

  • Schwab/ABAA Virtual Air Barrier Installation & Quality Control Fundamentals Webinar

    Presenter: Melissa Payne, BECxP, CxA-BE, CDT CEU: 1 AIA LU/HSW Register Here Join us for an informative presentation that emphasizes the importance of proper air barrier application in enhancing building performance. Properly installed air barriers are critical in preventing air leakage, which can lead to energy inefficiencies, moisture issues, and compromised indoor air quality. We […]

  • Update on the Current Building and Energy Codes That Affect the Air Barrier Industry 1.0 CEU/HSW

    Update on the Current Building and Energy Codes That Affect the Air Barrier Industry Building and energy efficiency codes can have huge impact on the Air Barrier Industry, affecting the specification and installation of air and water-resistive barrier systems. Following the code change process is a daunting task and even apparently small changes can have […]

  • Whole Building Airtightness Technician Training Course – Northbrook, IL

    WJE Northbrook 330 Pfingsten Road, Northbrook,, IL, United States

    Program Description The purpose of the ABAA Blower Door Technician Training Program is to educate both entry-level and more experienced blower door technicians on the planning, preparation, and execution of airtightness testing for commercial and large buildings in conformance with industry standard test methods. The training aims to equip blower door technicians with the knowledge […]

  • The Building Science Aspects of Enclosure Detailing and Tie-Ins 1.0 CEU/HSW

    The Building Science Aspects of Enclosure Detailing and Tie-Ins The building enclosure is made up of many material types, with the predominant need of protecting the building from water infiltration. In addition, materials and tie-ins are critical to control air flow, understand thermal bridging and risks of surface condensation, and the control and flow of […]

  • ABAA ExCom Meeting

    Conference Call All times shown are in Eastern Time Zones

  • ABAA Contractor Webinar: Pre-and Post Installed Balconies and Canopies Open Forum

    Adam Ugliuzza, Partner of the Building Enclosures Group for Sustainable Building Partners, will be hosting an open forum, focusing on pre-and post installed balconies and canopy details in real-world applications. Send project-specific issues with an example picture or detail to lhardman@airbarrier.org (redact sensitive information). The webinar will be interactive, and solutions will be provided on […]

  • Lessons Learned: Trades that Need to Include an AVB Discussion in their Specification & Preinstallation Meetings 1.0 CEU/HSW

    Lessons Learned: Trades that Need to Include an AVB Discussion in their Specification & Preinstallation Meetings When designing a building envelope wall system, specifying, detailing, and having a pre-installation discussion about the backup substrate and façade elements, considering the water, air, vapor, and insulation systems detailing, is critical. This involves careful coordination with all façade […]

  • ABAA Conference Field Auditor Training Course

    Hyatt Regency Minneapolis 1300 Nicollet Mall, Minneapolis, MN, United States

    ABAA Conference Field Auditor Training Course DESCRIPTION: This course emphasizes understanding the need for and function of an air barrier assembly, the ability to inspect installation and review materials for compliance with specifications, ABAA requirements, and manufacturer requirements, the ability to confirm proper installation through on-site testing and the documentation required throughout the air barrier […]