Pike High School Aquatics Center

Project Details

Architect: Fanning Howey Architects

General Contractor: J.C. Ripberger

Location: 5401 W 71st St, Indianapolis, IN 46268

Type: Educational

Value: $10,000,000

Building Area (sq. ft.): 40,000

Total Air Barrier Area (sq. ft.): 24,000

Accredited Contractor:  Superior Insulation Co. LLC

Air Barrier Installers: Matt Layou, Chuck Kratzer

Project Description

On the Aquatic Center Project the Architect was looking for a 2″ continuous insulation system to be installed on the exterior CMU wall. The architect chose an ABAA contractor to ensure the system was being installed properly and per the manufacturer’s guidelines.