BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ABAA - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:ABAA
X-ORIGINAL-URL:https://airbarrier.org
X-WR-CALDESC:Events for ABAA
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Detroit
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20260113T110000
DTEND;TZID=America/Detroit:20260113T120000
DTSTAMP:20260403T182425
CREATED:20251218T201026Z
LAST-MODIFIED:20251218T201026Z
UID:990000263-1768302000-1768305600@airbarrier.org
SUMMARY:ABAA Conference Committee Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-conference-committee-meeting-7/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20260112T110000
DTEND;TZID=America/Detroit:20260112T120000
DTSTAMP:20260403T182425
CREATED:20251218T014418Z
LAST-MODIFIED:20251218T014418Z
UID:990000261-1768215600-1768219200@airbarrier.org
SUMMARY:ABAA Contractors Committee Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-contractors-committee-meeting-8/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20260109T110000
DTEND;TZID=America/Detroit:20260109T120000
DTSTAMP:20260403T182425
CREATED:20251217T152653Z
LAST-MODIFIED:20251217T153218Z
UID:990000244-1767956400-1767960000@airbarrier.org
SUMMARY:ABAA ASI Ad Hoc Group Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-asi-ad-hoc-group-meeting-30/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20260108T130000
DTEND;TZID=America/Detroit:20260108T140000
DTSTAMP:20260403T182425
CREATED:20251124T204729Z
LAST-MODIFIED:20251215T201649Z
UID:990000231-1767877200-1767880800@airbarrier.org
SUMMARY:Saddle Up! Integrating Control Layers at Parapet to Rise Walls Conditions 1.0 CEU/HSW
DESCRIPTION: Saddle Up! Integrating Control Layers at Parapet to Rise Walls Conditions\nWater and air leakage\, deterioration\, and biological growth often occur at parapet terminations where adjacent rise walls lack proper integration of air and moisture control layers. These issues typically stem from missing or inadequate detailing\, sequencing\, trade coordination\, and installation—compounded by limited industry standards and general lack of awareness. While most designs rely on two-dimensional details\, complex roof-to-wall interfaces require multi-step\, three-dimensional detailing. Proper construction sequencing\, trade coordination\, and mock-ups—including saddle flashing—are essential. This presentation will review design principles for integrating control layers at complex conditions and demonstrate how freehand sketches\, paper folding\, 3D modeling\, collaboration with trades and manufacturers\, and mock-ups help develop effective saddle flashing details. \nLearning Objectives: \n\n Understand the importance of critical detailing of control layers at complex conditions to avoid air and water-related problems\n Learn effective ways to develop and design successful details at complex conditions that are constructable and durable\n Recognize the importance of considering construction sequencing and trade coordination when developing complex details\n Understand the importance of mock-ups for evaluating detailing\, sequencing and performance testing to ensure water-resistant and airtight designs\n\nRegister Now \nMichael Nagle\, NCARB\, Firmwide Quality Leader | Building Enclosures\, Cannon Design \nIn his role as a firmwide quality leader of building enclosures\, Michael Nagle leads CannonDesign’s building enclosure group\, leads standard development\, performs quality reviews\, and develops in-house training for fellow colleagues in the area of building science fundamentals and building enclosure design. Before joining CannonDesign (a global A/E design firm) in January 2022\, Michael served the industry as a building enclosure consultant while investigating many projects involving water and air leakage\, condensation\, and distress conditions in a variety of building enclosure systems at a leading consulting firm for nearly 20 years. \n  \n\n  \nJacob Morrison\, Associate AIA\, ANFA\, Designer III\, Cannon Design \nJake Morrison is committed to integrating technology to find creative solutions for each project’s unique challenges. At CannonDesign\, he uses metrics derived from iterative modeling and simulation to inform and refine the design process to meet the different needs each client\, project\, and site requirement. In the last 5 years\, Jake has been involved in many large scale projects serving as a building enclosure technical designer. \n 
URL:https://airbarrier.org/event/saddle-up-integrating-control-layers-at-parapet-to-rise-walls-conditions-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/11/Saddle-Up_01_08_26-WebsiteSlide.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20260108T110000
DTEND;TZID=America/Detroit:20260108T120000
DTSTAMP:20260403T182425
CREATED:20251218T134703Z
LAST-MODIFIED:20251218T134703Z
UID:990000262-1767870000-1767873600@airbarrier.org
SUMMARY:ABAA Ad Hoc Meeting - Build Out Contractor Panel Presentation: 2026 Conference
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-ad-hoc-meeting-build-out-contractor-panel-presentation-2026-conference/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20260105T150000
DTEND;TZID=America/Detroit:20260105T160000
DTSTAMP:20260403T182425
CREATED:20251218T004349Z
LAST-MODIFIED:20251218T004349Z
UID:990000260-1767625200-1767628800@airbarrier.org
SUMMARY:ABAA ExCom Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-excom-meeting-4/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251219T100000
DTEND;TZID=America/Detroit:20251219T110000
DTSTAMP:20260403T182425
CREATED:20250908T215233Z
LAST-MODIFIED:20250908T215233Z
UID:990000163-1766138400-1766142000@airbarrier.org
SUMMARY:ABAA ASI Ad Hoc Group Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-asi-ad-hoc-group-meeting-28/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251218T161500
DTEND;TZID=America/Detroit:20251218T171500
DTSTAMP:20260403T182425
CREATED:20251016T183536Z
LAST-MODIFIED:20251103T211158Z
UID:990000190-1766074500-1766078100@airbarrier.org
SUMMARY:Continuous Insulation Compared Within Eight Steel Stud Wall Assemblies  1.0 CEU/HSW
DESCRIPTION:Continuous Insulation Compared Within Eight Steel Stud Wall Assemblies\nContinuous Insulation\, while required by the energy code\, presents challenges integrating it with the overall wall-assembly’s design\, performance and construction. This program at the intermediate to advanced level\, comparatively studies eight steel-stud commercial wall assemblies with considerations including: Overview of the Assembly components\, High-performance Net-Zero Energy\, WUFI thermal and moisture modeling comparisons\, NFPA 285 and fire-rated compliance. \nLearning Objectives: \n\n OVERVIEW OF EIGHT ASSEMBLES: Understand the rationale of the eight commercial steel stud-framed wall-assemblies and how they compare with their types of continuous and total insulation\, sheathing\, air\, water and vapor control layers.\n HIGH-PERFORMANCE\, NET-ZERO ENERGY: Compare how each wall may comply or exceed the energy codes and become super-insulated to meet high-performance ASHRAE 189 requirements.\n AVOID PROBLEMS: Illustrate how more insulation can present problems with trapped moisture and condensation.\n WUFI: Understand how each assembly compares utilizing WUFI Hygrothermic (thermal and moisture) evaluations over four climate seasons chosen for Climate Zone 5 (due to the requirement for an interior vapor retarder).\n\nRegister Now \nDavid Schoenhard\, AIA\, Manager & Principal\, DSS-Philly \nDavid Schoenhard\, AIA has over 45 years’ experience in designing fine architecture\, with the last nine as the Principal of DSS-Philly\, one of the leading High-Performance Building Enclosure consulting firms in the Philadelphia region. He brings his decades of architectural experience to skillfully advise and design\, implement or remediate building enclosures on behalf of other architects\, owners and contractors. He is the inventor and developer of the high-performance Back-Lattice Wall Design. He actively researches comparative building enclosure assemblies\, speaks nationally\, and is an AIA Continuing Education Provider.
URL:https://airbarrier.org/event/continuous-insulation-compared-within-eight-steel-stud-wall-assemblies-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251218T150000
DTEND;TZID=America/Detroit:20251218T160000
DTSTAMP:20260403T182425
CREATED:20251016T175555Z
LAST-MODIFIED:20251103T211213Z
UID:990000189-1766070000-1766073600@airbarrier.org
SUMMARY:Air Barrier Installation & Quality Control Fundamentals  1.0 CEU/HSW
DESCRIPTION:Air Barrier Installation & Quality Control Fundamentals\nJoin us for an informative presentation that emphasizes the importance of proper air barrier application in enhancing building performance. Properly installed air barriers are critical in preventing air leakage\, which can lead to energy inefficiencies\, moisture issues\, and compromised indoor air quality. \nWe will delve into best practices for air barrier application\, highlighting the techniques that ensure continuity and effectiveness. Attendees will learn about common challenges faced during installation and the vital role of quality control in maintaining the integrity of the air barrier system. \nThrough real-world project photo’s\, we’ll illustrate key application requirements for a variety of air barrier materials and exactly what to look for when performing quality control and site-testing. \nLearning Objectives: \n\n Understand and demonstrate the essential techniques for proper air barrier installation\, ensuring continuity and effectiveness in various building applications.\nIdentify common pitfalls and obstacles in air barrier application\, and learn strategies to overcome these challenges to maintain optimal performance.\nUnderstand the importance of quality control processes during installation\, and learn specific inspection methods and testing protocols to ensure air barrier integrity.\nAnalyze real-world case studies to distinguish between effective and ineffective air barrier installations\, understanding the long-term consequences of proper application and maintenance.\n\nRegister Now \nMelissa Payne\, BECxP\, CxA+BE\, CDT\, Building Enclosure Consulting – Forensics Owner\, Midwest Enclosure Consulting\, LLC \nMelissa I. Payne focuses on offering building enclosure third-party consulting services. She founded Midwest Enclosure Consulting\, LLC September 2022\, where she focuses to help clients mitigate risk and to provide building envelope solutions no matter the structure’s phase – design\, construction\, or operation. Ms. Payne possesses a strong foundation in industry standards related to building envelope commissioning processes\, commissioning authority\, building science\, construction observation\, performance testing\, project management\, and general construction of building envelope systems including institutional\, schools\, higher education\, government\, healthcare\, hospitality\, and industrial projects. Her owner representative\, third-party consulting experience\, forensic work\, commissioning provider background\, and manufacturer internal consultant involvement gives her an all-enveloping perspective of the design and construction industry. Currently she works with owners\, architects\, engineers\, designers\, construction managers/general contractors\, and enclosure trades to promote the integrity and performance of building enclosures. She is known for bringing collaboration to the design and construction process. She focuses on bridging the gap in design and construction with design review services\, development of project specific details\, construction observation and documentation\, and focuses on mitigating risk as they relate to the design and construction of the building enclosure system.
URL:https://airbarrier.org/event/air-barrier-installation-quality-control-fundamentals-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251218T130000
DTEND;TZID=America/Detroit:20251218T140000
DTSTAMP:20260403T182425
CREATED:20251201T162928Z
LAST-MODIFIED:20251201T162928Z
UID:990000237-1766062800-1766066400@airbarrier.org
SUMMARY:ABAA Fellowship Committee Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-fellowship-committee-meeting/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251218T123000
DTEND;TZID=America/Detroit:20251218T133000
DTSTAMP:20260403T182425
CREATED:20251016T175003Z
LAST-MODIFIED:20251203T172240Z
UID:990000188-1766061000-1766064600@airbarrier.org
SUMMARY:Designing Wall Systems for Specific Climate Zones   1.0 CEU/HSW
DESCRIPTION:Designing Wall Systems for Specific Climate Zones\nCopying and pasting a wall or roof assembly that works in one part of our country into a project in another part of the country could be not just problematic\, but potentially catastrophic. This presentation will use data and hygrothermal modeling to articulate what happens when tried and true assemblies from one part of the country get moved to a very different climate. More importantly\, we’ll cover strategies to mitigate these issues. While many may be familiar with a Class I Vapor Retarder (“vapor barrier”) in the wrong part of an assembly\, we’ll also cover the impacts of insulation type\, the overreaction to perm ratings\, light-colored roofing membranes\, and reservoir claddings such as stucco and unit masonry. \nLearning Objectives: \n\nLearn climate-specific design strategies for durable construction.\nLearn to avoid common mistakes that can lead to mold\, rot\, mildew\, corrosion and decay.\nUnderstand how hygrothermal modeling can be used in the design process to ensure durability.\nLearn how material properties (permeability\, heat capacity\, density\, conductivity\, and porosity) impact wall assemblies.\n\nRegister Now \nJohn Posenecker\, P.E.\, Senior Principal And Regional Facilities Manager\, Terracon Consultants\, Inc.  \nJohn Posenecker is the Senior Principal and the Building Enclosure Practice Leader for Terracon Consultants\, Inc. He is a registered engineer in the State of Texas and Oklahoma. His experience includes the design\, construction\, testing and forensic investigation of building envelope systems. Previously\, he was an Estimating Manager with Chamberlin Roofing and Waterproofing from 2005 through 2015\, Project Manager for Advanced Environmental Concepts from 1997 through 2005\, an Engineering Team Leader at Southern Company Services from 1987 through 1997\, and a Senior Engineer with Bechtel Power from 1982 to 1987. \nThroughout his career\, Mr. Posenecker has participated in a wide variety of projects associated with the building envelope that include containment systems for commercial nuclear power plants; noise control systems for commercial and institutional projects; and waterproofing for commercial high-rise office and multi-family buildings\, medical and educational institutional projects\, and large concrete structural projects. Mr. Posenecker specializes in waterproofing and cladding systems associated with the building envelope. He is an active member in several professional organizations including the National Institute of Buildings Sciences (NIBS)\, the American Society for Testing and Materials (ASTM)\, the International Concrete Restoration Institute (ICRI). He is also on the executive committee for the National Building Enclosure Council. \n\nKayla Maines\, AIA\, Senior Architect\, Terracon Consultants\, Inc\, \nKayla Maines joined Austin Terracon-Facilities in May of 2018. She is a Registered Architect in the state of Texas and Oklahoma\, Legacy LEED AP\, and Building Enclosure Commissioning Provider (BECxP) and a Commissioning Authority +Building Enclosure (CxA+BE) She has 17 years of experience that includes managing projects from Schematic Design through Construction Administration\, multidiscipline coordination\, peer reviews\, design assistance\, building assessments\, reviews submittals and shop drawings\, performs field observations and building enclosure testing\, historic preservation\, and building enclosure commissioning. Kayla was the 2020 Chair of the Austin Building Enclosure Council (BEC: Austin) and currently serves as a board member for BEC: Austin. She also serves as the Secretary of the Austin Construction Specification Institute (CSI). Mrs. Maines is a Terracon Subject Matter Expert (SME) for Building Enclosure Commissioning (BECx) and an Authorized Project Review (APR).
URL:https://airbarrier.org/event/designing-wall-systems-for-specific-climate-zones-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251218T123000
DTEND;TZID=America/Detroit:20251218T133000
DTSTAMP:20260403T182425
CREATED:20251016T174201Z
LAST-MODIFIED:20251103T211236Z
UID:990000187-1766061000-1766064600@airbarrier.org
SUMMARY:Peeling Back the Onion   1.0 CEU/HSW
DESCRIPTION:Peeling Back the Onion\nThis presentation is an in-depth dive into a leak investigation at a high school Industrial Arts and Horticulture Building that snowballed into a remedial architecture project and then escalated further with discoveries that raised structural red flags and created an expansion to the original scope of work. While investigating water damage\, additional nonconforming conditions were uncovered and additional areas had to be opened\, revealing even more questionable building practices. In the end\, the structure of the south façade was replaced\, as well as 1/3 of the roof structure\, and the entire building was “re-skinned”. Due to the nature of the failures\, this project also became a case for litigation. \nThis presentation is presented as a Case Study that covers the timeline of the project from the initial investigation\, the layers of additional discoveries\, the remedial design\, and the construction process while briefly covering the litigation that followed. Throughout the timeline\, each layer of the onion is pulled back for discussion\, as well as to inform attendees of how each of those issues was overcome. \nLearning Objectives: \n\n Through a Case Study of a completed K-12 project\, participants will examine the importance of regular on-site QA/QC observations during the construction process\n Participants will discuss the importance of continuity between air and water barrier systems and how lapping and transitions between adjacent systems are often incorrectly addressed\n Participants will discuss the importance of well-planned and coordinated building maintenance plans in relation to an existing real-world project.\nParticipants will acquire a better understanding of sequencing and constructability and how what is drawn relates to what is actually constructed.\n\nRegister Now \nNathan Taylor\, CSI\, CDT\, Associate\, Building Enclosure Consultant\, DTR Consulting Services \nNathan Taylor\, CSI\, CDT\, is an accomplished international professional with extensive architectural design and building envelope experience. He holds a Master’s degree in Architecture and Urban Planning and is highly involved in CSI. Nathan oversees the Construction Phase Services and Forensic Investigation scope of project work at DTR Consulting Services. He is an advocate for spending time on construction sites and “learning by doing”. He is passionate about drawing as a form of design communication and hosts an annual Architectural-themed drawing event each October. He and his family live in northern California and enjoy spending time outdoors. He stays actively creative by drawing and writing novels in his free time.
URL:https://airbarrier.org/event/peeling-back-the-onion-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251218T111500
DTEND;TZID=America/Detroit:20251218T121500
DTSTAMP:20260403T182425
CREATED:20251216T211029Z
LAST-MODIFIED:20251216T212333Z
UID:990000242-1766056500-1766060100@airbarrier.org
SUMMARY:If It's Not Raining Why Is My Roof Leaking? 1.0 CEU/HSW
DESCRIPTION:If It’s Not Raining\, Why Is My Roof Leaking?\nRoof leaks and moisture within wall assemblies are never good for building performance. The typical response is to search for a rain-related leak—until it becomes clear that it isn’t raining at all. Without rainfall\, bulk water entry should not be occurring\, yet moisture continues to appear in the building enclosure. Too often\, the real causes are overlooked because not all mechanisms of moisture transport are considered. This leads many to incorrectly assume the issue lies with the perm rating of the water-resistive barrier. This presentation examines all primary modes of moisture movement within buildings\, explains why relying on the perm rating of a single material is misleading\, and reveals how moisture—often in significant volumes—can accumulate within the building envelope. \nLearning Objectives: \n\nIdentify the primary mechanisms of moisture transport in building envelopes\nDescribe the two most common causes of moisture accumulation in buildings\nExplain why water vapor transmission rate alone is an unreliable indicator of moisture risk\nDiscuss how and why moisture-related building problems tend to worsen over time\n\nRegister Now \nLaverne Dalgleish\, Executive Director\, ABAA \nMr. Laverne Dalgleish is the Executive Director of the Air Barrier Association of America (ABAA). As such\, he works to champion energy conservation in buildings while educating the building owners and designers about the benefits of energy conservation such as durability\, comfort\, reduced maintenance\, reduced HVAC equipment costs and the positive impact on the environment. \nMr. Dalgleish travels North America on a weekly basis to educate building owners and designers on the benefits of effective and working air barrier systems in buildings. This education mission includes working with standards development organizations\, training and education groups\, government policy departments\, and quality assurance program developers for the construction industry. Mr. Dalgleish is the Secretariat of two ISO Committees\, ISO TC61 SC10 Cellular Plastics and ISO TC163 SC3 Thermal Insulation Products. He is also Chair of the ULC Thermal Performance in the Building Environment Standards Committee. \nMr. Dalgleish was the key developer of the ABAA Quality Assurance Program for the installation of air barrier systems in buildings. This program is based on ISO9000 and ISO 12576-2 but brings the ISO requirements together with practical applications for the air barrier industry.
URL:https://airbarrier.org/event/if-its-not-raining-why-is-my-roof-leaking-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251218T110000
DTEND;TZID=America/Detroit:20251218T120000
DTSTAMP:20260403T182425
CREATED:20251120T184412Z
LAST-MODIFIED:20251120T184412Z
UID:990000212-1766055600-1766059200@airbarrier.org
SUMMARY:ABAA QAP Committee Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-qap-committee-meeting-6/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251218T100000
DTEND;TZID=America/Detroit:20251218T110000
DTSTAMP:20260403T182425
CREATED:20251016T165506Z
LAST-MODIFIED:20251103T211254Z
UID:990000185-1766052000-1766055600@airbarrier.org
SUMMARY:Building Envelope Case Study: From Initial Construction Through Occupancy  1.0 CEU/HSW
DESCRIPTION:Building Envelope Case Study: From Initial Construction Through Occupancy\nJoin me as I recount my building envelope journey with a large four-story CMU and masonry higher-educational building for a large university in the Midwest. We will start with the initial pre-bid constructability review and go through construction and turnover. We will review the air/vapor barrier\, masonry flashing\, waterproofing\, window installation\, and roof transitions. We will learn what was initially missing in the Contraction Documents through mock-ups and first-work-in-place reviews. Once construction starts\, we will review the building construction and perform testing throughout. \nLearning Objectives: \n\n Review constructability concerns in the mid-stage of design\nEngage with a building envelope review and what modifications took place with subcontractor input\nUnderstand the building complexities with mock-ups\, first-work-in-place reviews\, and testing.\nDevelop a better understanding of the installation of materials and the process of installation with construction observation reviews \, reporting\, and verification\n\nRegister Now \nCorey Zussman\, AIA\, NCARB\, ALA (IL\, IN\, WI) RBEC\, RRC\, REWC\, RWC\, RRO\, CABS\, CDT CQM\, CxA+BE\, BECxP\, LEED AP BD+C Level II Thermographer\, QA/QC Vice President\, AECOM Hunt Construction \nAs a forensic architect registered in several states\, Corey Zussman has practiced in the construction industry for more than 30 years. He specializes in the building envelope\, restoration\, preservation\, life safety\, and interior finishes. While working on an average of 50-75 projects a year\, Corey conducts constructability reviews\, pre-installation meetings\, comprehensive envelope meetings\, and construction observations. He has also become known for providing educational opportunities throughout the industry and has produced more than 150 “lessons learned” papers. Topics include building envelope and life safety concerns and enable Corey to proactively address issues during design review\, pre-construction\, and construction. In addition\, he has over 10 industry articles about building envelope and life safety topics and is also a frequent presenter at local and national conferences and Associations.
URL:https://airbarrier.org/event/building-envelope-case-study-from-initial-construction-through-occupancy-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251215T150000
DTEND;TZID=America/Detroit:20251215T160000
DTSTAMP:20260403T182425
CREATED:20251120T184321Z
LAST-MODIFIED:20251120T184321Z
UID:990000213-1765810800-1765814400@airbarrier.org
SUMMARY:ABAA Contractors Committee Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-contractors-committee-meeting-7/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251215T130000
DTEND;TZID=America/Detroit:20251215T140000
DTSTAMP:20260403T182425
CREATED:20251120T184214Z
LAST-MODIFIED:20251120T184214Z
UID:990000214-1765803600-1765807200@airbarrier.org
SUMMARY:ABAA Technical Committee Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-technical-committee-meeting-6/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251215T110000
DTEND;TZID=America/Detroit:20251215T120000
DTSTAMP:20260403T182425
CREATED:20251210T152043Z
LAST-MODIFIED:20251210T152043Z
UID:990000241-1765796400-1765800000@airbarrier.org
SUMMARY:ABAA Conference Committee Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-conference-committee-meeting-6/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20251215
DTEND;VALUE=DATE:20251220
DTSTAMP:20260403T182425
CREATED:20250813T192345Z
LAST-MODIFIED:20250813T192345Z
UID:990000128-1765756800-1766188799@airbarrier.org
SUMMARY:Whole Building Airtightness Technician Training Course - Seattle\, WA
DESCRIPTION:Program Description\nThe purpose of the ABAA Blower Door Technician Training Program is to educate both entry-level and more experienced blower door technicians on the planning\, preparation\, and execution of airtightness testing for commercial and large buildings in conformance with industry standard test methods. The training aims to equip blower door technicians with the knowledge and skills necessary to appropriately evaluate\, prepare\, test\, analyze\, and report on a building’s airtightness performance. \nThe ABAA Blower Door Technician Training Program is a 40-hour training program delivered over 5 days by subject matter experts retained by ABAA who are guided by detailed lesson plans. In addition to receiving instruction from experienced experts\, the trainees will also have the opportunity to plan and carry out simulated building airtightness tests on physical mock-ups during the training program. \nThe program is intended to help prepare the trainees to become a Certified Blower Door Technician through ABAA’s certification program\, but completion of the training program is not required for ABAA certification. The trainees will learn about the certification program and requirements during the training program. \nFor the purposes of demonstrations\, activities\, and simulations\, this training program uses equipment from two widely used blower door fan manufacturing companies. \nMore Information \nTraining Course Fees: \n\nMembers – $2\,500.00\nNon-Members – $2\,850.00\n\nAdditional Fees: \n\nLevel 1 Registration & Exam – Members $495.00 Non-Members $695.00\nLevel 2 Registration & Exam – Members $595.00 Non-Members $895.00\n\n\nTraining Location: \nGeorgetown Campus\nPuget Sound Industrial Excellence Center\nApprenticeship & Education Center\nBuilding A\n6737 Corson Ave. S\, Seattle\, WA 98108\nPhone: 206.934.5350 \nLocation Details:\nPark in the lot off Marginal Way.\nSigns directing students will be posted once in Building A. \n \nRegistration is limited to 12 students. Sign up today and secure your spot! \nRegistration Deadline: Wednesday\, November 26\, 2025\n  \nRegister Today
URL:https://airbarrier.org/event/whole-building-airtightness-technician-training-course-seattle-wa-2/
LOCATION:Georgetown Campus\, 6737 Corson Avenue South\, Seattle\, WA\, 98108\, United States
CATEGORIES:Training Courses
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/03/Blue-Border-images-07.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251212T130000
DTEND;TZID=America/Detroit:20251212T140000
DTSTAMP:20260403T182425
CREATED:20250915T175946Z
LAST-MODIFIED:20250915T175946Z
UID:990000167-1765544400-1765548000@airbarrier.org
SUMMARY:ABAA Board of Directors Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-board-of-directors-meeting-3/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251212T100000
DTEND;TZID=America/Detroit:20251212T110000
DTSTAMP:20260403T182425
CREATED:20250908T215213Z
LAST-MODIFIED:20250908T215213Z
UID:990000147-1765533600-1765537200@airbarrier.org
SUMMARY:ABAA ASI Ad Hoc Group Meeting
DESCRIPTION:Conference Call \nAll times shown are in Eastern Time Zones
URL:https://airbarrier.org/event/abaa-asi-ad-hoc-group-meeting-27/
CATEGORIES:ABAA Committee Calls
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/07/Committee-Calls.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251211T181500
DTEND;TZID=America/Detroit:20251211T191500
DTSTAMP:20260403T182425
CREATED:20251016T162328Z
LAST-MODIFIED:20251103T211126Z
UID:990000184-1765476900-1765480500@airbarrier.org
SUMMARY:Blown Away - Unmasking the Secrets of Whole Building Airtightness Testing  1.0 CEU/HSW
DESCRIPTION:Blown Away – Unmasking the Secrets of Whole Building Airtightness Testing\nWhole building airtightness testing has been a code compliance option in the International Energy Conservation Code and ASHRAE 90.1 for some time. That compliance option was rarely used and only became mandatory as part of a building owners’ requirements\, or a specific state or jurisdictional requirement that was limited to one or two states. \nAs we moved towards Net Zero\, building codes “tightened” up and it is expected this will become a test that is mandatory on a more country wide basis. It seems that time has arrived\, with many states now requiring mandatory whole building airtightness testing. As we move towards those requirements\, it is important to understand the latest in test methods\, current and projected code requirements\, how to specify the test properly\, coordination needed with the construction team and what type of pre-qualifications exists that you can rely upon. \nLearning Objectives: \n\n Identify the current building code requirements on both the national and local levels\, plus the must-know details of eco-friendly building programs that are trending right now.\nArticulate what the airtightness test provides and how those results can be used to improve the building enclosure\n Define the differences among the various test methods available as code or specification options\n Review guide specification sample language and typical pitfalls in current specifications\nIdentify credentialing programs that can help you find pre-qualifications of testing personnel for large buildings\n\nRegister Now \nDenali Jones\, P.E.\, Technical Director\, Air Barrier Association of America \nDenali is an engineer focused on building enclosures for his entire career. After working for a manufacturer he transitioned into consulting\, working for one of the leading building science firms in North America for over a decade. Denali’s work focused on finding practical and performance driven solutions to complex enclosure problems\, ranging from high-rise office towers to hospitals\, multifamily\, manufacturing facilities\, and everything in between. He has extensive experience in all aspects of enclosure design\, including roofing\, glazing systems\, horizontal waterproofing\, below grade waterproofing\, air barriers\, and rainscreen wall assemblies with just about any type of cladding. Denali also is an industry leading expert in whole-building air leakage testing\, having helped develop several test standards and code language around testing requirements. He was instrumental in developing ABAA’s whole-building air leakage testing training program and is the lead instructor for this program. Denali now serves as the technical director for ABAA\, focusing on driving the adoption and advancement of air barriers both at a committee level as well as providing support for ABAA members in answering technical questions or delivering presentations and training.
URL:https://airbarrier.org/event/blown-away-unmasking-the-secrets-of-whole-building-airtightness-testing-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251211T170000
DTEND;TZID=America/Detroit:20251211T180000
DTSTAMP:20260403T182425
CREATED:20251016T134516Z
LAST-MODIFIED:20251103T211117Z
UID:990000183-1765472400-1765476000@airbarrier.org
SUMMARY:Introduction to Spray Polyurethane Foam (SPF) for the Building Enclosure  1.0 CEU/HSW
DESCRIPTION:Introduction to Spray Polyurethane Foam (SPF) for the Building Enclosure\nThis course provides a complete overview of spray polyurethane foam (SFP) technology and applications for residential and commercial buildings. It covers a brief history\, types of products and installation equipment. A review of chemical safety and environmental impact is provided\, along with SPF performance for heat\, air and moisture control. Examples of residential and commercial applications are provided\, with references to compliance with US building codes. \nLearning Objectives: \n\nReview of SPF development history and product types and applications for residential and commercial construction.\n Discuss health and safety aspects of SPF\, including chemical safety\, fire safety and environmental impacts.\n Define performance of SPF materials in regard to heat\, air and moisture control in the building enclosure\n Review ICC building code requirements for SPF insulation and roofing systems\n\nRegister Now \nRichard Duncan\, PhD Engineering\, Professional Engineer (PA)\, Technical Consultant\, Envelogic \n Rick has more than 30 years experience in mechanical\, architectural and materials engineering\, developing a wide range of building materials and products for the building enclosure. From 2008 to 2024\, he serviced as Technical and Executive Director for the Spray Polyurethane Foam Alliance (SPFA). Prior to joining SPFA\, Rick served as Global New Product Director for CertainTeed/Saint Gobain Insulation. He has a bachelor of science in mechanical engineering ( U of Maryland) and master of science in Mechanical Engineering (Bucknell)\, and a PhD in Engineering Science and Mechanics (Penn State). He is a registered professional engineer in Pennsylvania.
URL:https://airbarrier.org/event/introduction-to-spray-polyurethane-foam-spf-for-the-building-enclosure-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251211T154500
DTEND;TZID=America/Detroit:20251211T164500
DTSTAMP:20260403T182425
CREATED:20251006T210530Z
LAST-MODIFIED:20251203T230139Z
UID:990000182-1765467900-1765471500@airbarrier.org
SUMMARY:Top Air Barrier Details for Commercial Construction  1.0 CEU/HSW
DESCRIPTION:Top Air Barrier Details for Commercial Construction\nIt’s often been said that architecture is the synthesis of art and science\, but the art of crafting a thoughtful and successful detail is often something that has to be learned on the job or at the school of hard knocks. This presentation will build on building science basics with in-depth study of detailing in multiple areas of the building envelope. Good and bad examples of real-life details will be reviewed from drawing to photos of built conditions to demonstrate how design intent gets translated into built form. \nLearning Objectives: \n\nIdentify locations in commercial building envelopes that merit close attention during the detailing process\nDescribe how design decisions such as material selection impact air tightness and the complexity of the resulting details\nExplore details that successfully and unsuccessfully manage air\, water and thermal control layers\nInvestigate the relationship between the four primary control layers and how to determine which take priority\n\nRegister Now \nChris Bubser\, AIA\, LEED AP BD+C\, Senior Technical Architect\, LHB Corp \nChris Bubser’s passion has always been detailing\, a specialty he cultivated as a Builder\, Architect\, Virtual Design and Construction Coordinator\, and Quality Manager on a variety of commercial and residential buildings around the Midwest. Chris has worked as a Senior Technical Architect at LHB since 2019\, where he leverages his diverse background in all phases of design\, construction contract administration\, facility condition assessments\, forensic analysis\, and mentoring emerging professionals in the dark arts of detailing. He served on the Board of the Building Enclosure Council of Minnesota from 2014 to 2022\, including two years as Chair.
URL:https://airbarrier.org/event/top-air-barrier-details-for-commercial-construction-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251211T143000
DTEND;TZID=America/Detroit:20251211T153000
DTSTAMP:20260403T182425
CREATED:20251006T205831Z
LAST-MODIFIED:20251103T211059Z
UID:990000181-1765463400-1765467000@airbarrier.org
SUMMARY:Design Principles for Rainscreen Wall Systems  1.0 CEU/HSW
DESCRIPTION:Design Principles for Rainscreen Wall Systems\nThe topic will discuss thorough understanding of the various components that lead to failure in Building Enclosures and how to prevent it with Rainscreen system solutions. The importance of structural/Hygrothermal design of wall systems and air barriers\, vapor and thermal control in the walls will be presented. Owner/user benefits in using material manufacturer’s in design phase and how that leads to a FULL Building Envelope Hygrothermal Warranty from the manufacturer will be discussed. Finally\, we will discuss innovative ways to simplify the design\, construction\, commissioning and handover of the facility while maintaining the performance requirement(s) of the building design. \nLearning Objectives: \n\n Think of an enclosure as a system/assembly not individual component. Each has to be designed to work together for the overall Enclosure\n Detailing and inspection of AWB is most critical and should be the responsibility of the AWB manufacturer. The Assembly Manufacturer/supplier should provide overall assembly.\nDiscuss Non Proprietary Specifications\, Detailing\, and bid documents and working in tandem with GC.\n Learn innovative ways to simplify the design\, construction\, commissioning and handover of the facility while maintaining the performance requirement(s) of the building design.\n\nRegister Now \nJonnie Hasan\, PE BECxP\, CxA+BE\, Director of Engineering and Sales Support\, Innovative Metals Company \n Jonnie has more than 22 years of experience in commercial construction\, design-build\, and cladding industry. In his position\, Jonnie has various roles: including building envelope designer\, WUFI analyst\, manufacturing engineer\, sustainable smart building engineer\, and operations manager. Jonnie is also certified as a Building Envelope Commissioning Provider & Commissioning Authority designation by University of Wisconsin. Jonnie strives to guide clients to the most cost effective and efficient product application. Jonnie is a registered Professional Engineer with numerous patents related to building cladding system and design.
URL:https://airbarrier.org/event/design-principles-for-rainscreen-wall-systems-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251211T131500
DTEND;TZID=America/Detroit:20251211T141500
DTSTAMP:20260403T182425
CREATED:20251006T204716Z
LAST-MODIFIED:20251103T211048Z
UID:990000180-1765458900-1765462500@airbarrier.org
SUMMARY:Masonry Thru-Wall Flashing and Key Interface Details  1.0 CEU/HSW
DESCRIPTION:Masonry Thru-Wall Flashing and Key Interface Details\nExplore the continuity of water and air control layers in relation to masonry thru-wall flashing at critical interface details\, including: base-of-wall\, window sill\, openings heads\, shelf angle\, veneer material transitions\, and top-of-wall. \nLearning Objectives: \n\n Understand masonry thru-wall flashing function and options\n Realize how masonry thru-wall flashing coordinates with water and air control layers\n Gain insights into common installation practices with jobsite photography\nDevelop an appreciation for thorough architectural details at key interface details in exterior wall assemblies\n\nRegister Now \nPat Conway\, AIA\, CSI\, Director\, Industry Development & Technical Services\, International Masonry Insitute \n Mr. Conway is a registered architect in Wisconsin and has been a masonry consultant for the past 28-years. He is an active member of the American Institute of Architects (AIA) and the Construction Specifications Institute (CSI)\, Director of IMI’s internal Masonry Technical Team\, distinguished masonry speaker and author.
URL:https://airbarrier.org/event/masonry-thru-wall-flashing-and-key-interface-details-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251211T120000
DTEND;TZID=America/Detroit:20251211T130000
DTSTAMP:20260403T182425
CREATED:20251006T202514Z
LAST-MODIFIED:20251103T211039Z
UID:990000179-1765454400-1765458000@airbarrier.org
SUMMARY:When Codes are in Conflict: Building Science and Life Safety in Wood Framed Construction  1.0 CEU/HSW
DESCRIPTION:When Codes are in Conflict: Building Science and Life Safety in Wood Framed Construction\nOver time\, changes in building codes have begun to challenge designers to meet life safety\, indoor air quality\, and energy efficiency requirements on wood-framed\, mid-rise multi-family projects. When NFPA 13 sprinkler requirements are driving the design of the roof assembly\, the risk of condensation often increases: While vented roof assemblies are effective in steep slope applications\, the thermodynamics of a vented low-slope roof assembly make condensation more likely. To combat this many designers opt to provide a non-vented assembly with rigid insulation above the roof deck. This approach will generally trigger NFPA 13 sprinkler requirements which many developers and general contractors attempt to side-step by filling the roof cavity with a non-combustible insulation. The additional insulation within the framing requires careful consideration of vapor control strategies. It is critical for enclosure consultants to understand the code requirements that pertain to Type V construction and be able to identify the risks associated with the various compliance paths. In this presentation we will examine the various paths to code compliance while still applying building science principles to limit condensation risk. Detailed roof system examples will be provided\, demonstrating how these measures can enable durable AND code compliant roofing assemblies. \nLearning Objectives: \n\n Knowledge of code changes and how they impact durability in roofing assemblies.\n How to choose a vapor control strategy that meets the code requirements for life safety\, indoor air quality\, and energy efficiency.\n The impact of value engineering decisions related to sprinklers on roof performance.\n How hygrothermal modeling can inform the amount\, type\, and placement of insulation in a roof assembly.\n\nRegister Now \nErin Andes\, PE (CA\, WY)\, LEED AP\, Director of Design Outreach\, GAF \n As the Director of Design Outreach for the GAF Building and Roofing Science Team\, Erin works with designers to review project designs to mitigate risk and achieve affordable\, durable\, watertight\, and energy-efficient roof assemblies. In addition to helping design teams with roof assemblies and details\, she regularly presents and publishes technical content related to building and roofing science at conferences and training events. Her background includes building enclosure consulting on new construction and enclosure rehabilitation of a range of project types such as multi-family\, commercial\, institutional\, religious\, cultural\, and healthcare buildings. In addition\, Erin has provided investigation and litigation support services on building enclosure and product failures giving her great perspective on what to avoid in new construction and repairs.
URL:https://airbarrier.org/event/when-codes-are-in-conflict-building-science-and-life-safety-in-wood-framed-construction-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/10/Live-Rewind-Event-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251210T100000
DTEND;TZID=America/Detroit:20251210T173000
DTSTAMP:20260403T182425
CREATED:20250828T215357Z
LAST-MODIFIED:20251031T175012Z
UID:990000140-1765360800-1765387800@airbarrier.org
SUMMARY:ABAA & CSI Dallas - Air Barrier Rodeo
DESCRIPTION:Register \nAir Barrier Rodeo: Bridging Knowledge with Practice – Dallas\, TX\nPresented by the Air Barrier Association of America in Collaboration with CSI Dallas \nJoin us for a day of expert-led education with leading voices in building enclosures\, air barriers\, and airtightness. ABAA is proud to partner with CSI Dallas for this high-level event featuring best practices for achieving durable\, continuous air barrier systems – reinforced through live\, hands-on mock-up demonstrations. \n\nThrough Wall & Transition Membranes – Selection & Installation\, 1.0 LU/HSW\nUnderstanding Difficult Critical Transitions of Air\, Vapor and Moisture Barriers\, 1.5 LU//HSW\nDon’t Go There: Navigating the Real\, Imperfect Air Barrier Details\, 1.0 LU/HSW\nAir Barrier Mock-Up Demonstration\, 2.0 LU/HSW\n\nPresenters: \n\nMeagan Elfert\, CDT\, MBA\, CBS\, Vice President\, York Flashings\nCorey Zussman\, AIA\, NCARB\, ALA (IL\, IN\, WI)\, QA/QC Vice President\, AECOM – Hunt Construction\nPamela Jergenson\, FCSI\, CDT\, CCS\, CCCA\, BECxP\, CxA+BE\, CABS\, Technical Director of Building Science Solutions\, Intertek\n\nSponsorship Opportunities \n\nMock-Up Sponsor – $750\nLunch Sponsor – $500\nTabletop Sponsor – $250\n\nClick here to Sponsor
URL:https://airbarrier.org/event/abaa-csi-dallas-air-barrier-rodeo/
CATEGORIES:Industry Events
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/08/CSI-Dallas-Featured-Image.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251209T130000
DTEND;TZID=America/Detroit:20251209T140000
DTSTAMP:20260403T182425
CREATED:20251118T193802Z
LAST-MODIFIED:20251119T231126Z
UID:990000209-1765285200-1765288800@airbarrier.org
SUMMARY:BE Live - Key Factors for Enclosure Resilience: Heat\, UV\, Water and Air Performance
DESCRIPTION:Key Factors for Enclosure Resilience: Heat\, UV\, Water and Air Performance\nDesigning Beyond Code for Building Resiliency and Durability \nSponsored by Air Barrier Association of America | Presented by Benjamin Meyer and Andrea Wagner Watts \nLive Webinar Airing on December 9 at 01:00 PM ET \nRegister \nIn an era of increasingly severe storms\, building resilience is paramount. This presentation explores how robust whole-building air barrier assemblies create a resilient shield against extreme environmental stresses. We will delve into designing high-performance building envelopes\, integrating resilience through evolving code standards\, and comparing past practices to future advancements. \nThe session will also examine various roof and wall assemblies\, supported by lab tests and real-world data. Finally\, we’ll cover essential quality assurance protocols\, including building enclosure commissioning and whole building airtightness testing\, to ensure your designs perform as intended. \n\nBenjamin Meyer is the Building Enclosure Business Director with Siplast. Previous experience includes: enclosure consultant principal\, technical management for enclosure products\, architecture\, real-estate development and construction management. He serves as a past Member of the LEED Technical Committee\, Chair of the ASHRAE 90.1 Envelope Committee\, and a Director of ABAA. \n  \n  \n\nAndrea Wagner Watts is the Building Science Education Manager for GAF | Siplast Building & Roofing Science\, engaging with industry professionals to provide guidance\, technical support and education for roof and wall assemblies. With more than 15 years of experience in the industry\, Andrea strives to improve the overall performance of the building enclosures through application innovation\, product development and building science research. Andrea has published on building science\, assembly interfaces\, durability and resilience and holds multiple patents. She serves as an executive board member of ABAA\, is the co-chair of their Technical Committee and chairs the ASTM E06 and D08 Task Groups on air barriers assemblies
URL:https://airbarrier.org/event/be-live-key-factors-for-enclosure-resilience-heat-uv-water-and-air-performance/
CATEGORIES:Industry Events
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/11/BE-Symposium-Dec-9-2025-1.png
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251209T100000
DTEND;TZID=America/Detroit:20251209T173000
DTSTAMP:20260403T182425
CREATED:20250828T215305Z
LAST-MODIFIED:20251029T064812Z
UID:990000139-1765274400-1765301400@airbarrier.org
SUMMARY:ABAA & CSI Houston - Air Barrier and Enclosure Education
DESCRIPTION:Register \nA DAY OF AIR BARRIER & ENCLOSURE EDUCATION – HOUSTON\, TX\nPresented by the Air Barrier Association of America in Collaboration with CSI Houston \nJoin us for a day of expert-led education with leading voices in building enclosures\, air barriers\, and airtightness. ABAA is proud to partner with CSI Houston for this high-level event featuring best practices for achieving durable\, continuous air barrier systems – reinforced through live\, hands-on mock-up demonstrations. \n\nThrough Wall & Transition Membranes – Selection & Installation\, 1.0 LU/HSW\nUnderstanding Difficult Critical Transitions of Air\, Vapor and Moisture Barriers\, 1.5 LU//HSW\nDon’t Go There: Navigating the Real\, Imperfect Air Barrier Details\, 1.0 LU/HSW\nAir Barrier Mock-Up Demonstration\, 2.0 LU/HSW\n\nPresenters: \nMeagan Elfert\, CDT\, MBA\, CBS\, Vice President\, York Flashings \nCorey Zussman\, AIA\, NCARB\, ALA (IL\, IN\, WI)\, QA/QC Vice President\, AECOM – Hunt Construction \nPamela Jergenson\, FCSI\, CDT\, CCS\, CCCA\, BECxP\, CxA+BE\, CABS\, Technical Director of Building Science Solutions\, Intertek \nRegister
URL:https://airbarrier.org/event/abaa-csi-houston-air-barrier-and-enclosure-education/
CATEGORIES:Industry Events
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/08/CSI-Houston.png
END:VEVENT
END:VCALENDAR