BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ABAA - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:ABAA
X-ORIGINAL-URL:https://airbarrier.org
X-WR-CALDESC:Events for ABAA
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Detroit
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20251106T130000
DTEND;TZID=America/Detroit:20251106T140000
DTSTAMP:20260409T173800
CREATED:20250912T202649Z
LAST-MODIFIED:20251031T210554Z
UID:990000164-1762434000-1762437600@airbarrier.org
SUMMARY:What the Heck Happened\, A Case Study in a New Building's Stucco Gone Wrong 1.0 CEU/HSW
DESCRIPTION:What the Heck Happened\, A Case Study in a New Building’s Stucco Gone Wrong\nA recently constructed charter elementary school had a huge problem. Their new stucco of about 8 years was extensively cracked and the window perimeters were leaking into the classrooms. This case study will address the steps of investigation which included forensic discovery of the extent of the problems and the resultant decomposition damage and insect infestation which occurred due to the problem water infiltration. This will then address the assessment that the originally designed traditional three-coat stucco\, was mis-applied. Instead of applying the required second or brown coat\, the problem assembly jumped ahead and installed an extra-thick finish coat. This then caused excessive shrinkage\, extensive spider cracking\, and complete delamination of the finish coat from the stucco backup scratch coat. The cracks and the delamination allowed the free-flow of wind-driven rain to travel past the mis-flashed windows and into the children’s classrooms. To remove and reinstall traditional three-coat stucco with a color finish would not have fit into the summer construction schedule\, so instead\, a drainage back\, direct-apply\, DEFS to cement board stucco system\, along with new flashings and fluid-applied air and weather barrier was selected. This allowed the entire remediation project to occur within the summer construction season prior to the start of school. The result is a water-tight project\, that looks exactly like the original stucco intent\, but now is even better with reliable back-drainage\, flashings\, and of-course without the plaguing problems. \nLearning Objectives: \n\nReview the guidelines for traditional three-coat stucco.\nDescribe why too much of the stucco finish coat may cause a problem.\nClarify why flashings are needed at windows instead of relying on the integrity of the finish materials.\nContrast the differences between three-coat stucco\, EIFS\, and DEFS hard-coat to cement board systems.\n\nRegister Now \nGeorge David Schoenhard\, AIA\, ABAA\, REWC\, BECxA\, RRO\, CSI\, LEED AP\, OSHA\, Manager & Principal\, Design Support Services of Philadelphia\, LLC (DSS-Philly) \nGeorge David Schoenhard\, AIA has over 45 years’ experience in designing fine architecture\, with the last nine as the Principal of DSS-Philly\, one of the leading High-Performance Building Enclosure consulting firms in the Philadelphia region. He brings his decades of architectural experience to skillfully advise and design\, implement or remediate building enclosures on behalf of other architects\, owners and contractors. He is the inventor and developer of the high-performance Back-Lattice Wall Design. He actively researches comparative building enclosure assemblies\, speaks nationally\, presents ABAA Webinar’s\, and is an AIA Continuing Education Provider.
URL:https://airbarrier.org/event/what-the-hell-happened-a-case-study-in-a-new-buildings-stucco-gone-wrong-1-0-ceu-hsw/
CATEGORIES:CEU Webinars
ATTACH;FMTTYPE=image/png:https://airbarrier.org/wp-content/uploads/2025/09/WhattheHellHappened_11_06_25-WebsiteSlide.png
END:VEVENT
END:VCALENDAR